SyncProductionScheduleDataAreaType
Complex type information
Namespace: http://www.openapplications.org/oagis/10
Schema document: SyncProductionSchedule.xsd
Properties: ID: oagis-id-0bc45f7db8c94ee582950a730b583fea
Content
- Sequence [1..1]
- Sync [1..1] The Sync verb is used when the owner of the data is passing or publishing that information or change in information to other software components. This is to be used when the receiver of the SyncBOD does not own the data. This verb is commonly used when mass changes are necessary or when a publish and subscribe mechanism is used in the integration architecture.The purposes of this verb include application integrity and ease of data entry for the business user by enabling a single point of input.
- ProductionSchedule [1..*] ProductionSchedule is generally used in the Process Manufacturing Industries to schedule a Production run or multiple production runs.
Attributes
None
Used by
- Element DataArea