ResourceAllocationType
Allocation Type for detailing the division of expenses and income
Complex type information
Namespace: http://www.openapplications.org/oagis/10
Schema document: Common.xsd
Properties: ID: oagis-id-5b0ada09ba02498db9af81ce041411d0
Content
- Sequence [1..1]
- Resource [0..*] Specifies details of a resource
- UnitCost [0..1] The incremental cost of the resource.
- RequiredQuantity [0..1] The quantity required of the associated entity.
- RequiredDuration [0..1] The period of time the resource is required.Note: This is inapplicable for an ItemResource.
- TotalCostAmount [0..1] The total cost of this project, as either an entered amount (no activity costing) or calculated as the sum of the activity costs. This field is updated by the LoadProjectAccounting BOD.
- Description [0..*]
- Note [0..*]
- Extension [0..1] Allows the user of OAGIS to extend the specification in order to provide additional information that is not captured in OAGIS.This is done by defining the additional information in XML Schema and referencing the new schema in the xml instance document through the use of namespaces. Once this is done the additional information defined there can be carried in the BOD XML instance document.The Open Applications Group will make best efforts to quickly consider all proposed submissions.The Extension is always the last element in all components, except where the component has been extended inline.
from type IdentificationTypefrom type ResourceAllocationBaseTypefrom group ResourceAllocationGroupfrom group FreeFormTextGroup
Attributes
Name | Occ | Type | Description | Notes |
---|---|---|---|---|
typeCode | [0..1] | CodeType_1E7368 | from type IdentificationType | |
actionCode | [0..1] | ActionCodeContentType | from type IdentificationType |
Used by
- Element ResourceAllocation
Type inheritance chain
- IdentificationType
- ResourceAllocationBaseType
- ResourceAllocationType
- ResourceAllocationBaseType