ChangeProductionScheduleDataAreaType
Complex type information
Namespace: http://www.openapplications.org/oagis/10
Schema document: ChangeProductionSchedule.xsd
Properties: ID: oagis-id-fb94acb6aa384955a5a834e56bc6e85f
Content
- Sequence [1..1]
- Change [1..1] The Change verb is used when the sender of the BOD is not the owner of the data, but is sending a request for the document to be changed.An example of this is Change REQUISITN, where the original document needs to be changed based on a specific business event.
- ProductionSchedule [1..*] ProductionSchedule is generally used in the Process Manufacturing Industries to schedule a Production run or multiple production runs.
Attributes
None
Used by
- Element DataArea