ChangeConfirmWIPDataAreaType
Complex type information
Namespace: http://www.openapplications.org/oagis/10
Schema document: ChangeConfirmWIP.xsd
Properties: ID: oagis-id-179750e45da746d3a5f5d0036ee6b559
Content
- Sequence [1..1]
- Change [1..1] The Change verb is used when the sender of the BOD is not the owner of the data, but is sending a request for the document to be changed.An example of this is Change REQUISITN, where the original document needs to be changed based on a specific business event.
- ConfirmWIP [1..*] Work-in-Progress confirmation represents confirmation of the movement of WIP materials. The noun refers to general information about the entire WIP transaction, as well as line item detail about the specific WIP operation or routing step. This may apply to the movement of raw materials or finished products.
Attributes
None
Used by
- Element DataArea