ResourceAllocationBaseType
Allocation Type for detailing the division of expenses and income
Complex type information
Namespace: http://www.openapplications.org/oagis/10
Schema document: Common.xsd
Properties: ID: oagis-id-c7b8801cf80e44f49fd712efb03f2850
Content
- Sequence [1..1]
- Resource [0..*] Specifies details of a resource
- UnitCost [0..1] The incremental cost of the resource.
- RequiredQuantity [0..1] The quantity required of the associated entity.
- RequiredDuration [0..1] The period of time the resource is required.Note: This is inapplicable for an ItemResource.
- TotalCostAmount [0..1] The total cost of this project, as either an entered amount (no activity costing) or calculated as the sum of the activity costs. This field is updated by the LoadProjectAccounting BOD.
- Description [0..*]
- Note [0..*]
from type IdentificationTypefrom group ResourceAllocationGroupfrom group FreeFormTextGroup
Attributes
Name | Occ | Type | Description | Notes |
---|---|---|---|---|
typeCode | [0..1] | CodeType_1E7368 | from type IdentificationType | |
actionCode | [0..1] | ActionCodeContentType | from type IdentificationType |
Used by
- Element ResourceAllocation via derived type ResourceAllocationType
Type inheritance chain
- IdentificationType
- ResourceAllocationBaseType
- extended by ResourceAllocationType
- ResourceAllocationBaseType