MaintenanceOrder
A Maintenance Order is an order for a machine, building, tooling or fixed asset to be repaired or for preventitive maintenance to be performed.
Element information
Namespace: http://www.openapplications.org/oagis/10
Schema document: Common.xsd
Type: MaintenanceOrderType
Properties: Global, Qualified, ID: oagis-id-daf4d121dfe54551b704c04cebbf4d48
Content
- Sequence [1..1]
- MaintenanceOrderHeader [0..1] Information that generally describes the maintenance order
- MaintenanceOrderLine [0..*]
Attributes
Name | Occ | Type | Description | Notes |
---|---|---|---|---|
typeCode | [0..1] | CodeType_1E7368 | ||
actionCode | [0..1] | ActionCodeContentType |
Used in
- Type AcknowledgeMaintenanceOrderDataAreaType (Element DataArea)
- Type CancelAcknowledgeMaintenanceOrderDataAreaType (Element DataArea)
- Type CancelMaintenanceOrderDataAreaType (Element DataArea)
- Type ChangeAcknowledgeMaintenanceOrderDataAreaType (Element DataArea)
- Type ChangeMaintenanceOrderDataAreaType (Element DataArea)
- Type GetMaintenanceOrderDataAreaType (Element DataArea)
- Type NotifyMaintenanceOrderDataAreaType (Element DataArea)
- Type ProcessMaintenanceOrderDataAreaType (Element DataArea)
- Type ShowMaintenanceOrderDataAreaType (Element DataArea)
- Type SyncMaintenanceOrderDataAreaType (Element DataArea)
- Type SyncResponseMaintenanceOrderDataAreaType (Element DataArea)
Sample instance
<MaintenanceOrder> <MaintenanceOrderHeader> <ID/> <RevisionID>normalizedString</RevisionID> <VariationID>normalizedString</VariationID> <DocumentIDSet> <ID/> </DocumentIDSet> <LastModificationDateTime></LastModificationDateTime> <DocumentDateTime></DocumentDateTime> <Description/> <Note/> <DocumentReference> <ID/> <RevisionID>normalizedString</RevisionID> <VariationID>normalizedString</VariationID> <DocumentIDSet>... </DocumentIDSet> <DocumentDateTime></DocumentDateTime> <Description/> <Note/> <Status>... </Status> <LineNumberID/> <LineIDSet>... </LineIDSet> <Extension>....................................... </Extension> </DocumentReference> <Attachment> <ID/> <IDSet>... </IDSet> <EmbeddedDataBinaryObject/> <URI>normalizedString</URI> <ISBN>normalizedString</ISBN> <FileName/> <DocumentDateTime></DocumentDateTime> <Description/> <Note/> <FileTypeCode>normalizedString</FileTypeCode> <FileSizeQuantity>1.0</FileSizeQuantity> <Title/> <Extension>....................................... </Extension> </Attachment> <Status> <ID/> <IDSet>... </IDSet> <Code/> <Description/> <ReasonCode>normalizedString</ReasonCode> <Reason/> <EffectiveTimePeriod>.................. </EffectiveTimePeriod> <Extension>....................................... </Extension> </Status> <PriorityCode>normalizedString</PriorityCode> <ParentMaintenanceOrderID>normalizedString</ParentMaintenanceOrderID> <ReportedDateTime></ReportedDateTime> <RespondByDateTime></RespondByDateTime> <ChangeDateTime></ChangeDateTime> <FailureDateTime></FailureDateTime> <Effectivity> <ID/> <IDSet>... </IDSet> <Name/> <Preference>... </Preference> <EffectiveValueList>... </EffectiveValueList> <EffectiveRange>... </EffectiveRange> <EffectiveTimePeriod>.................. </EffectiveTimePeriod> <Extension>....................................... </Extension> </Effectivity> <PlannedTimePeriod> <InclusiveIndicator>true</InclusiveIndicator> <StartDateTime></StartDateTime> <StartTime>token</StartTime> <Duration>P1Y2M3DT10H</Duration> <EndDateTime></EndDateTime> <EndTime>token</EndTime> </PlannedTimePeriod> <ScheduledTimePeriod> <InclusiveIndicator>true</InclusiveIndicator> <StartDateTime></StartDateTime> <StartTime>token</StartTime> <Duration>P1Y2M3DT10H</Duration> <EndDateTime></EndDateTime> <EndTime>token</EndTime> </ScheduledTimePeriod> <ActualTimePeriod> <InclusiveIndicator>true</InclusiveIndicator> <StartDateTime></StartDateTime> <StartTime>token</StartTime> <Duration>P1Y2M3DT10H</Duration> <EndDateTime></EndDateTime> <EndTime>token</EndTime> </ActualTimePeriod> <BudgetedAmount/> <EstimatedAmount/> <ActualAmount/> <EstimatedDuration>P1Y2M3DT10H</EstimatedDuration> <ActualDuration>P1Y2M3DT10H</ActualDuration> <RemainingDuration>P1Y2M3DT10H</RemainingDuration> <Machine> <ID/> <IDSet>... </IDSet> <Description/> <Note/> <Property>... </Property> <Classification>... </Classification> <MachineItemIdentification>... </MachineItemIdentification> <SerialNumberID>normalizedString</SerialNumberID> <FixedAssetCode>normalizedString</FixedAssetCode> <Status>... </Status> <Extension>....................................... </Extension> </Machine> <Facility> <ID/> <IDSet>... </IDSet> <Name/> <Description/> <Note/> <Address>... </Address> <Coordinate>... </Coordinate> <Extension>....................................... </Extension> </Facility> <JobPlanID>normalizedString</JobPlanID> <PreventiveMaintenanceID>normalizedString</PreventiveMaintenanceID> <CalendarID>normalizedString</CalendarID> <SplitOperationsIndicator>true</SplitOperationsIndicator> <PlannerID>normalizedString</PlannerID> <SupervisorID>normalizedString</SupervisorID> <RequesterID>normalizedString</RequesterID> <ProjectReference> <ID/> <IDSet>... </IDSet> <ResourceCodes>... </ResourceCodes> <Description/> <Amount/> <Location>... </Location> <TimePeriod>.................. </TimePeriod> <ActivityID>normalizedString</ActivityID> <Extension>....................................... </Extension> </ProjectReference> <Distribution> <ID/> <IDSet>... </IDSet> <LedgerID>normalizedString</LedgerID> <DocumentReference>... </DocumentReference> <Attachment>... </Attachment> <Percentage>1.0</Percentage> <Quantity/> <Amount/> <GeneralLedgerNominalAccount>normalizedString</GeneralLedgerNominalAccount> <GeneralLedgerElement>... </GeneralLedgerElement> <EnterpriseUnit>... </EnterpriseUnit> <ProjectReference>... </ProjectReference> <Extension>....................................... </Extension> </Distribution> <EstimatedAllocateResources> <ID/> <IDSet>... </IDSet> <ResourceAllocation>... </ResourceAllocation> <InventoryAllocation>... </InventoryAllocation> <LaborAllocation>... </LaborAllocation> <MachineAllocation>... </MachineAllocation> <OperationAllocation>... </OperationAllocation> <ToolAllocation>... </ToolAllocation> <Extension>....................................... </Extension> </EstimatedAllocateResources> <ActualResources> <ID/> <IDSet>... </IDSet> <Actual>... </Actual> <InventoryActual>... </InventoryActual> <LaborActual>... </LaborActual> <MachineActual>... </MachineActual> <OperationActual>... </OperationActual> <ToolActual>... </ToolActual> <Extension>....................................... </Extension> </ActualResources> <Safety> <ID/> <IDSet>... </IDSet> <Hazard>... </Hazard> <Extension>....................................... </Extension> </Safety> <Failure> <ID/> <IDSet>... </IDSet> <Problem>... </Problem> <Extension>....................................... </Extension> </Failure> <Extension> <AnyExtension> <!--any element--> </AnyExtension> <Amount/> <Code/> <DateTime></DateTime> <ID/> <Indicator>true</Indicator> <Measure/> <Name/> <Number>1.0</Number> <Quantity/> <Text/> <Time></Time> <ValueText>string</ValueText> </Extension> </MaintenanceOrderHeader> <MaintenanceOrderLine> <LineNumberID/> <LineIDSet> <ID/> </LineIDSet> <Description/> <Note/> <DocumentReference> <ID/> <RevisionID>normalizedString</RevisionID> <VariationID>normalizedString</VariationID> <DocumentIDSet>... </DocumentIDSet> <DocumentDateTime></DocumentDateTime> <Description/> <Note/> <Status>... </Status> <LineNumberID/> <LineIDSet>... </LineIDSet> <Extension>....................................... </Extension> </DocumentReference> <Attachment> <ID/> <IDSet>... </IDSet> <EmbeddedDataBinaryObject/> <URI>normalizedString</URI> <ISBN>normalizedString</ISBN> <FileName/> <DocumentDateTime></DocumentDateTime> <Description/> <Note/> <FileTypeCode>normalizedString</FileTypeCode> <FileSizeQuantity>1.0</FileSizeQuantity> <Title/> <Extension>....................................... </Extension> </Attachment> <Status> <ID/> <IDSet>... </IDSet> <Code/> <Description/> <ReasonCode>normalizedString</ReasonCode> <Reason/> <EffectiveTimePeriod>.................. </EffectiveTimePeriod> <Extension>....................................... </Extension> </Status> <OperationDocumentIdentification> <ID/> <RevisionID>normalizedString</RevisionID> <VariationID>normalizedString</VariationID> <DocumentIDSet>... </DocumentIDSet> <Extension>....................................... </Extension> </OperationDocumentIdentification> <ActualDuration>P1Y2M3DT10H</ActualDuration> <RemainingDuration>P1Y2M3DT10H</RemainingDuration> <EstimatedDuration>P1Y2M3DT10H</EstimatedDuration> <CompletionDateTime></CompletionDateTime> <Effectivity> <ID/> <IDSet>... </IDSet> <Name/> <Preference>... </Preference> <EffectiveValueList>... </EffectiveValueList> <EffectiveRange>... </EffectiveRange> <EffectiveTimePeriod>.................. </EffectiveTimePeriod> <Extension>....................................... </Extension> </Effectivity> <MeterRecording> <ID/> <IDSet>... </IDSet> <MeterID>normalizedString</MeterID> <RecordedMeasure>1.0</RecordedMeasure> <RecordingDateTime></RecordingDateTime> <InspectorID>normalizedString</InspectorID> <Extension>....................................... </Extension> </MeterRecording> <Safety> <ID/> <IDSet>... </IDSet> <Hazard>... </Hazard> <Extension>....................................... </Extension> </Safety> <Failure> <ID/> <IDSet>... </IDSet> <Problem>... </Problem> <Extension>....................................... </Extension> </Failure> <Distribution> <ID/> <IDSet>... </IDSet> <LedgerID>normalizedString</LedgerID> <DocumentReference>... </DocumentReference> <Attachment>... </Attachment> <Percentage>1.0</Percentage> <Quantity/> <Amount/> <GeneralLedgerNominalAccount>normalizedString</GeneralLedgerNominalAccount> <GeneralLedgerElement>... </GeneralLedgerElement> <EnterpriseUnit>... </EnterpriseUnit> <ProjectReference>... </ProjectReference> <Extension>....................................... </Extension> </Distribution> <EstimatedAllocateResources> <ID/> <IDSet>... </IDSet> <ResourceAllocation>... </ResourceAllocation> <InventoryAllocation>... </InventoryAllocation> <LaborAllocation>... </LaborAllocation> <MachineAllocation>... </MachineAllocation> <OperationAllocation>... </OperationAllocation> <ToolAllocation>... </ToolAllocation> <Extension>....................................... </Extension> </EstimatedAllocateResources> <ActualResources> <ID/> <IDSet>... </IDSet> <Actual>... </Actual> <InventoryActual>... </InventoryActual> <LaborActual>... </LaborActual> <MachineActual>... </MachineActual> <OperationActual>... </OperationActual> <ToolActual>... </ToolActual> <Extension>....................................... </Extension> </ActualResources> <Extension> <AnyExtension> <!--any element--> </AnyExtension> <Amount/> <Code/> <DateTime></DateTime> <ID/> <Indicator>true</Indicator> <Measure/> <Name/> <Number>1.0</Number> <Quantity/> <Text/> <Time></Time> <ValueText>string</ValueText> </Extension> </MaintenanceOrderLine> </MaintenanceOrder>